We have worked with Orangebox for many years and each year we are tasked with installing the latest Clerkenwell design week art installation in the main reception of their London offices.
This year the installation was hundreds of ceramic birds which when looked from underneath showed a map of London engraved into their wings.
This amazing installation was one of the hardest we have done due to its intricacy and fragile nature which required some very specialist lifting equipment.
Access was tight and limited so we used a special crank lift and after consulting our friendly structural engineer used chemical ceiling fixings. The installation now takes pride of place in their reception – statement piece if there ever was one!
Comments